AI Infrastructure · Flagship

Power in. Tokens out.

Turnkey environments for training frontier models and serving production inference — designed, built and operated as a single system.

Reference architecture

The AI factory, drawn.

Nine modules, one contract. Substation to service endpoint — JDI owns the stack from the transformer to the token.

Each module is documented, telemetered, and independently upgradable — so the facility keeps pace with the silicon roadmap without a rebuild.

Reference architecture
HAL-REF-01
Power220 MWCoolingPUE 1.18GPU Rack60–130 kWFabric400G · IBStorageTB/sAI PlatformTokens/s
The stack

Nine modules. Zero seams.

Each module has a specification, a set of instrumentation, and an SLA. Together they compose an AI factory.

01

GPU Clusters

Reference designs for 1K to 100K accelerator deployments — pre-validated, ready to train.

02

AI Compute

Bare-metal and orchestrated compute across H100, H200, B200 and next-gen silicon.

03

Training Infrastructure

Non-blocking fabrics, checkpoint-class storage, and thermal envelopes tuned for weeks-long runs.

04

Inference Infrastructure

Latency-optimized pods with autoscaling, model caching, and sub-10ms P99 targets.

05

High Density Racks

Liquid-cooled racks from 40kW to 130kW — engineered for tomorrow's silicon roadmap.

06

AI Storage

Parallel filesystems delivering terabytes-per-second to training clusters. Object tiers for datasets.

07

High Speed Networking

InfiniBand NDR and 800G Ethernet spines. RDMA fabrics that scale without hotspots.

08

AI Factory

End-to-end turnkey AI production lines — power in, tokens out.

09

Future AI Platform

Developer surface, model registry, and inference APIs on JDI-owned compute.

01

Reserve

Commit to capacity — bare metal, containerized, or platform tier.

02

Deploy

JDI commissions the pod, validates the fabric, hands over keys.

03

Operate

24/7 NOC, priority interconnect, capacity elasticity as your roadmap grows.

Get in touch

Reserve capacity on the next generation.

H200 and B200 pods commissioning through 2026. Reserved allocations and priority interconnects available.